Failure to conduct release detection, notify DEQ of a petroleum release, and submit documentation of release investigation and abatement. Contact:Jim Datkoatthe DEQNorthern Regional Office. Share & Bookmark, Press Enter to show all options, press Tab go to next option, Permitting Enhancement and Evaluation Platform (PEEP), Superfund Amendments and Reauthorization Act (SARA), Virginia Environmental Excellence Program, Governor's Environmental Excellence Awards, Tidewater Air Monitoring Evaluation Project, Per- and Polyfluoroalkyl Substances (PFAS), Land Application - Virginia Pollution Abatement (VPA). Comment Period: June 19, 2023 July 19, 2023, Dragados USA, Inc.; Virginia Beach, VA. Comment Period June 20 - July 20, 2023, C&D Tree Service, Inc; Fairfax, VA. Comment Period: June 19, 2023 - July 20, 2023, Soil Solutions Group LLC; Powhatan County, VA. Carrollton Used Auto Parts, Inc. and Richard A. Holloway Jr. (804) 914-3508, Northern Regional Office
Find Enforcement Efforts in VA Lead Resources View Current and Forecast Air Quality Index All Popular Resources for VA Comments & Meetings EPA Meetings and Events in Virginia EPA Public Notices in Virginia Environmental Info Air Water Cleanups Other Federal & State Contacts EPA Regional Office EPA Hotlines Report Environmental Violations Comment Period: July 18 August 17, 2023, Northern Neck Metals Recycling, LLC; Richmond County,VA; Comment Period: August 1, 2023 - August 30, 2023. What is a Voluntary Environmental Assessment? As announced in a June 29 press release and memo to stakeholders, DEQ will work with Professional Wetland Delineators to make its own State Surface Water Determinations for Virginia Water Protection permits.This will keep Virginia's economy moving forward while protecting the Commonwealth's wetlands and streams and will remove uncertainty in light of the U.S. Supreme Court's May 25 . Failure to submit Visual Emissions Evaluation (VEE) test protocol, perform a VEE, and submit a copy of VEE test results. Contact:Matt Richardsonat the DEQPiedmont Regional Office. Implementation Guidance for Reissuance of the VPDES General Permit for Domestic Sewage Discharges of Less Than or Equal to 1,000 Gallons Per Day, Local Water Quality Protections for Nonpoint Source Nutrient Credit Use for Regulated Land Disturbing Activities, Board Guidance Document: Resource Protection Area- Onsite Buffer Area Delineation, Board Guidance Document: Resource Protection Area-Buffer Area Encroachments, Board Guidance Document: Silvicultural Operations, Board Guidance Document: Nonconforming Structures and Uses, Board Guidance Document: Determination of Water Bodies with Perennial Flow, Board Guidance Document: Resource Protection Areas: Permitted Development Activities, Board Guidance Document: Administrative Procedures for the Designation and Refinement of Chesapeake Bay Preservation Boundaries, Resource Protection Areas: Nontidal Wetlands, Implementation of the Virginia Pollutant Discharge Elimination System (VPDES) General Permit for Vehicle Wash Facilities and Laundry Facilities (VAG 75), Streamlined Plan Review for Construction Stormwater Plans and Erosion and Sediment Control Plans submitted by a Licensed Design Professional and reviewed by a Dual Combined Administrator for Erosion and Sediment Control and Stormwater Management, Stormwater Management and Erosion & Sediment Control Design Guide, Nutrient Management Plans for Irrigation Reuse of Reclaimed Water and Land Treatment of Wastewater, Water Division Guidance Memorandum No. Contact:Jim Datkoatthe DEQ Northern Regional Office. The Virginia Department of Environmental Quality proposes to issue a Consent Special Order to Chaney Enterprises, LP for alleged violation of the Virginia Air Pollution Control Law at the facility located at 5901 Richmond Henrico Turnpike, City of Richmond, Virginia. Summary: Recyc Systems, Inc. has submitted an application for the reissuance of their existing Virginia Pollution Abatement (VPA) Permit No. A description of the proposed action is available here. 97-1004), Utilization of the Wood Furniture Manufacturing Title V Permit Boilerplate (Memo No.
Final Orders | Virginia DEQ For details please review. DEQ has released draft guidance,Environmental Justice in the Permitting Process, for an informal comment period, which ended on May 1. We're working to better understand the presence of PFAS, a "forever chemical," in the Chickahominy River watershed Learn more Success in advancing environmental justice through DEQs activities does not simply involve checking boxes, but rather putting a process in place to build trust, share understanding, and align values among community members, stakeholders, local, state and federal government, industry partners and DEQ staff. An attorney may represent individuals at the IFF but is not required. Failure to conduct cathodic protection, secure equipment of tanks in temporary closure, and demonstrate financial responsibility.
Land Disturbance | Roanoke, VA The Virginia Petroleum Storage Tank Fund Reimbursement Guidance Manual, Volume IV, 007 UCR Schedules: For Work Authorized On Or After March 1, 2007; The Virginia Petroleum Storage Tank Fund Reimbursement Guidance Manual, Volume V, Reconsideration Procedures Applicable to initial Reimbursement Decisions issued after March 1, 2007, Threatened and Endangered Species Screening for VPDES Permits, Permitting Considerations for Facilities in the Chesapeake Bay Watershed - Amendment 2, Permitting Considerations for Facilities in the Chesapeake Bay Watershed, Addendum No. A description of the proposed action is available, Russell County; Russell County, VA. Richmond, VA 23218, Street Address:
Enforcement | Virginia DEQ An enforcement action has been proposed for LCVA Holdings, LLC for violations of State Water Control Board statutes and regulations and applicable permit at the Chantilly Place STP facility located in Chantilly, Virginia. 5 - Hazardous Waste Emergency Permits, Policy for Handling Investigation Derived Waste, Addendum to Policy for Handling Investigation Derived Waste, RCRA Corrective Action Risk Assessment Guidance, Guidance for Soil Analysis Required for Facilities Treating Petroleum Contaminated Soil Under the Provisions of 9 VAC 20-80-360, Surface Water Impacts at Solid Waste Landfills, Scenarios Under Which A Part A Amendment Is Or Is Not Required, Implementation of the New Operations Manual Requirements, Interpretive Guidance for Groundwater Well Replacement Actions at Solid Waste Landfills, Seismic Impact Zone - Part A Requirements, Close Safely the Old 1205 Permitted Landfills, On-Site Composting of Routine Animal Mortality, Solid Waste Compliance Program Inspection Manual, CROSSWALK COMPARISION 9VAC20-80 VERSUS 9VAC20-81, Solid Waste Special Waste Disposal Requests, Notice of Expansion for Category 2 and Category 3 Facilities, Local Landfill Certification for Non-Captive Industrial Landfills, Siting and Groundwater Monitoring for Landfills and the Vicinity of Wetlands, On-Site Burial of Routine Animal Mortality, HELP Model - Leachate generation for tank design, Sanitary Landfill Siting Relative to a Public Water Supply Intake or Reservoir, Solid Waste Management Plan 5-Year Update Guidance, Financial Assurance for Stockpiles of Materials for Beneficial Use or Other Uses, Management and Reuse of Contaminated Media, Research Development and Demonstration Plans, Guidance on the Director's Determination in 10.1-1408.1.D.1 of the Code of Virginia - Permit by Rule Submissions, Coordination of Permitting Requirements for Wetlands and the Siting of Solid Waste Landfills, Permitting Guidance for the 10 Year Permit Review, P. E. Certifications Required for Permit by Rules, Statement Regarding Data to be Incorporated into the Regulations for Solid Waste Management Planning, Solid Waste Financial Assurance Procedures, Landfill Construction Oversight Inspections, Landfill Mining Applicability and Application Requirements, Waste Information Request and Trade Secret Protection, Clarification of Required Final Cover Designs and Acceptable Alternate Designs, Use of Mechanically Stabilized Earth (MSE) Berms in Landfill Design, Permitting, Sampling, Analysis, and Data Reporting associated with Solid Waste Landfill Underdrain Systems, Clarification of Landfill Gas Regulatory Requirements, Frequently Asked Questions about Convenience Centers, Odor Guidance for Solid Waste Management Facilities, Managing Leachate in Compliance with the VSWMR, Use of Alternate Concentration Limits for Establishing Groundwater Protection Standards (GPS), Virginia Waste Tire Program - Standards for Use of Tire Chips in a Residential Septic Drainfield, Virginia Waste Tire Program Utilization of Waste Tire Shred/Chips, Submission Instructions - 2012 Revision Approval Memo, Submission Instruction 01 - Procedural Requirements for a New or Modified Solid Waste Management Facility Application, Submission Instruction 02 - Design Plans and Report for Solid Waste Disposal Faciilities, Submission Instruction 03 - Design Plans and Report for Waste to Energy, Thermal Treatment, and Incineration Facilities, Submission Instruction 04 - Design Plans and Report for Other Solid Waste Management Facilities, Submission Instruction 06 - Closure and Post-Closure Plans, Submission Instructions 07 - Leachate Management Plan for Solid Waste Management Facilties, Submission Instruction 09 - Requirements for Financial Assurance Mechanisms, Submission Instruction 10 - Procedural Requirements for Permits-By-Rule, Submission Instruction 13 - Landfill Gas Management, Remediation, and Odor Plans for Solid Waste Disposal Facilities, Submission Instruction 15 - Groundwater Nature and Extent Studies at Solid Waste Landfills, Submission Instruction 16 - Assessment of Corrective Measures for Groundwater at Solid Waste Landfills, Submission Instruction 17 - Corrective Action Plan, Submission Instruction 18 - Proposal for Presumptive Remedies, Submission Instruction 19 - Alternate Source Demonstrations, Submission Instruction 20 - Termination of Post-Closure Activity Evaluation, Submission Instruction 21 - Monitored Natural Attenuation, Submission Instructions 22 - Groundwater Alternate Point of Compliance Variance Petitions, Submission Instructions 23 - Groundwater Annual Reports, Submission Instructions 24 - Groundwater Semi-Annual and Quarterly Monitoring Reports, Submission Instructions for MNA-based CASE Reports at Solid Waste Landfills, Submission Instructions for Groundwater Pump & Treat Based CASE Reports at Solid Waste Landfills, Submission Instruction 27 - Landfill Mining Operating Plans for Solid Waste Disposal Facilities, Submission Instructions 28 - Submission Instruction for Applying Site-Specific Alternate, Submission Instruction No. Please enable JavaScript in your browser for a better user experience. Through this work, we seek to ensure that the regulated community remains in compliance with environmental laws. 2021), Closure Guidance-Wood Treatment Facilities - Drip Pads, Emergency Permits Virginia Hazardous Waste Management Regulations and the RCRA Regulations - Guidance Summary, EOD Emergency Response Operations and Emergency Permits Clarification, "Contained-in" and "Contained-out" Policy Guidance for Soils Contaminated with Hazardous Waste, Hazardous Waste Generated at Remote Site Locations By Utility and Rail Companies, Risk Based Closure - (REAMS) Risk Exposure and Analysis Modeling System, Siting Requirements for Hazardous Waste Management Facilities, Hazardous Waste Financial Assurance Procedures, Waste Procedure No. 1111 East Main St
Regional Offices, NOTE: The website page organization structure has changed. Contact: Jefferson Reynoldsby email Jefferson.Reynolds@DEQ.Virginia.gov or postal mail at the DEQPiedmont Regional Office. Failure to complete release detection, cathodic protection, operator training, and financial responsibility requirements. DEQ is proposing an enforcement action for Harold A. Puryear Trucking, Inc. for violations of the State Water Control Board statutes and regulations in Russell County. An enforcement action has been proposed for Hiway MHC, LLC for violations of State Water Control Board statutes and regulations and applicable permits at the Hiway Mobile Home Community sewage treatment plant located in Leesburg, Virginia. DEQ's Division of Enforcement webpage to access final enforcement actions, consent orders, and enforcement history in the Commonwealth. Regional Offices, NOTE: The website page organization structure has changed. Please take a short, Chesapeake Tunnel Joint Venture; Virginia Beach, VA. DEQ proposes to issue a Consent Order with injunctive relief to Page County. Virginia Electric and Power Company Consent Decree (U.S. v. VEPCO) BRRO: BR17-0412: Volvo Group North America, LLC for the Dublin, VA Facility: 2007, and 2016) of the DEQ Civil Enforcement Manual on Virginia Regulatory Town Hall (ID: 4012, CEM-01, CEM-04, CEM-05, CEM-06, CEM-07, CEM-10, CEM-11, CEM-11A, and CEM-11B). Share & Bookmark, Press Enter to show all options, press Tab go to next option, Permitting Enhancement and Evaluation Platform (PEEP), Tidewater Air Monitoring Evaluation Project, HB 206 Renewable Energy & Natural Resources, Chesapeake Bay Nutrient & Sediment Reduction Milestones, Criteria, Designated Uses, Antidegradation, Eastern Virginia Groundwater Management Advisory Committee, VirginiaRoanoke River Basin Advisory Committee, Emergency Animal Mortality Management for Non-Disease Scenarios, Virginia Clean Water Revolving Loan Fund (VCWRLF), Local, State and Regional Solid Waste Planning, Solid Waste Facility Requirements and Guidance, Superfund Amendments and Reauthorization Act (SARA), Virginia Environmental Excellence Program, Governor's Environmental Excellence Awards, Governor's Environmental Excellence Award Winners, Sustainability Program Application Instructions, Virginia Outdoors Plan Implementation Instructions, Virginia Environmental Emergency Response Fund. Environmental justice at DEQ doesn't just depend on the work of a few. Comment Period: July 17, 2023 - August 16, 2023, High Up Crewe, Inc.; Nottoway County, VA. The myDEQ portal is DEQ's comprehensive, online reporting tool that is available to users 24 hours a day, seven days per week. * Document applies to one or more specific chapters and not to the board as a whole Richmond, VA 23219, Resources:
An enforcement action has been proposed for Woodbridge MHP, LLC for violations of State Water Control Board statutes and regulations and applicable permit at the Woodbridge MHP located in Woodbridge, Virginia.
Comment Period: June 19, 2023 - July 20, 2023, Page County; Page County, VA. 98-1002), Existing Source Startup, Shutdown, and Malfunction Opacity Exclusion for Title V Permits, Implementation Guidance for Issuance of Article 3 Federal Operating Permits, Memorandum of understanding between Shenandoah National Park and Commonwealth of Virginia regarding PSD permitting issues, Memorandum of understanding between Jefferson National Forest and Commonwealth of Virginia Regarding PSD Permitting Issues, Interpretation of the term "designed to accommodate", Relocation of Portable Non-diesel Engines, Clarification of 9VAC5-80-1695.F - Exemption of Alternative Fuels under Major NSR, Air Permitting Guidelines - New and Modified PSD Sources, New and Modified Major Sources in Nonattainment Areas and Ozone Transport Region, Interim Guidance on Prevention of Significant Deterioration (PSD), Air Permit Guidance for Control Technology Standards, Article 6 - Minor New Source Review Permit Program Manual, Draft, Permitting and BACT Applicability under Chapter 80 Article 6, Air Permit Guidance for Processing Non-Metallic Mineral Processing Facility General Permits, Section 112(g) Implementation Guidance (Policy No. This chapter does not address
The proposed ORDER is availablehere. The proposed Consent Order is available here. Comment Period: June 23, 2023 - July 23, 2023, Tazewell County; Tazewell County, VA. An enforcement action has been proposed for the Walbridge Aldinger LLC for violations at the LVL Data Center 08 facility located in Mecklenburg County, Virginia. A description of the proposed action is available here. A consent order is an administrative order issued by DEQ to a Responsible Party with its consent. SWRO: SW18-0824 Parkway Contractors, Inc. & Bobby D. Franklin: Family Dollar Store at Barren Springs: VPDES: $10,000: N: Y Failure to complete release detection, operator training, spill prevention, overfill prevention, monthly and annual walkthrough inspections, and corrosion prevention. Permits
PDF Facility/Owner/Operator Information Update Form - Virginia Failure to manage pollutants from a confined poultry feed operation without a VPA permit. The Virginia Department of Environmental Quality proposes to issue a Consent Special Order to Asia Petroleum, Inc. for alleged violation of the State Water Control Law at the Als Market facility located at 3440 Anderson Highway in Powhatan County, Virginia. DEQ's regional offices are the primary point of contact for most people doing business with the agency regarding air, water, or waste issues.
Land Application - Virginia Pollution Abatement | Virginia DEQ Contact:Katherine Mannatthe DEQNorthern Regional Office.
DEQ regional offices - p2infohouse.org Failure to develop a SWPPP, submit DMRs, conduct comprehensive site compliance evaluations, conduct quarterly visual examinations, submit e-DMR application, submit registration statement. Failure to maintain records, conduct release detection, amend notification form, complete operator training, conduct spill and overfill prevention, and conduct monthly walkthrough inspections.
Mages Guild Oblivion Recommendations,
Com Zaxxer Hikari Util Driverdatasource,
Houses For Rent Camden County, Nj,
Articles V